Implementation of the Oslo Guidelines for the disposal of dredged material at sea CEDA Dredging Days € 20,-
Environmental aspects, the disposal of dredged material in the Rijnmond region CEDA Dredging Days € 20,-
The origin and dispersal of silt and measures to reduce the volume of dredging CEDA Dredging Days € 20,-
Electronics for accurate dredging and excavating of soil for tunnelling and trenching CEDA Dredging Days € 20,-