Proactive adaptive spill management - A case study from a pipeline trenching and backfilling project in Baltic Sea CEDA Dredging Days € 20,-
Beneficial use of sediment - use of sediment tracing in global projects to address dredging and port challenges CEDA Dredging Days € 20,-
Challenges and innovations for the installation of the Princess Elisabeth Island, the world’s first offshore energy island CEDA Dredging Days € 20,-
Investigating the performance of four-component model in flow loop experiments with sand-gravel mixtures of varying grain size and gradation CEDA Dredging Days € 20,-
Large scale Nature-based Solutions deliver flood protection and nature restoration in the Scheldt Estuary CEDA Dredging Days € 20,-
Investigating the reshaping of estuarine shoals through sediment relocation CEDA Dredging Days € 20,-
Booster pump interaction and control for long dredging and mining pipelines: a study using multiphase 1D-CFD CEDA Dredging Days € 20,-